Chafing can occur on hoses at the rear of the turntable on certain LS60 aerial devices built from February...
Altec technical service bulletin SIL 810 for 2018-2021 Altec Aerial Device.
- Bulletin number
- SIL 810
- Component
- Equipment
- Summary
- Chafing can occur on hoses at the rear of the turntable on certain LS60 aerial devices built from February 2018 to February 2021. Altec requires the hose routing to be inspected on the affected units no later than the next periodic maintenance interval or 60 days from the receipt of this SIL, whichever comes first. The Inspection Procedure can be completed by a customer in less than 30 minutes. If the inspection criteria are not met, the customer can order the Hose Securing Kit and any required replacements for damaged hoses. Install the kit and hoses within 90 days of the receipt of the SIL. This inspection and repair are covered under the Altec Warranty Policy and can be performed by Altec, the customer, or the customer’s warranty provider. Altec will perform the work for free at an Altec facility.
Vehicles covered
- Altec Aerial Device 2018-2021 2018201920202021
VIN decoder
See the problems and recalls for an exact car
Buying a used Altec Aerial Device?
Check the exact car before you pay: accidents, salvage or flood titles, odometer readings and previous owners.
Check its history